PROJECT LUKOIL

2014

Industrial Project: Construction of a Hydrocracking Installation at Lukoil Neftochim Burgas Refinery
Period: 2012 -2014
Description: Full logistics support to approx. 80 000 freight tonnes of equipment including oversized cargo

The biggest challenge for our team on this project was the lack of appropriate infrastructure for transport of heavy oversize cargo throughout Burgas city. The dimensions of the largest cargo unit were LWH 23.8 m х 8.0m х 8.0m, while the longest cargo (an NH3 Stripper) required a truck+trailer composition of total length of 60 m. 
The delivery of oversize cargoes was successfully completed within two working days and the hydrocracking installation of Lukoil has been operating in full capacity since the fall of 2015.